How many people would be willing to take a final exam after reading only one chapter of the course textbook? Hopefully no one. So why do so many people only focus on one chapter of their performance story?
My experience has always been that most program managers feel their job is done once they've defined what their Expected Results (ER) are. Occassionaly, I come across a program manager that also takes an interest in which Performance Indicators (PI) are used to measure progress against those results. But it's very rare that I find someone who finishes their performance story by also identifying appropriate targets.
Here's an example of how the three chapters fit together into a story.
Say you're a program manager responsible for delivering a program that treats drinking water on reserves. Your performance story might look something like this:
Expected Result: Clean and safe drinking water for the residents of the Little Buffalo Reserve.
Performance Indicator: Number of boil water advisories.
If you end your performance story there, you get misleading data. While there's no doubt that boil water advisories are directly related to clean and safe drinking water, you have to ask what your target is.
The way it reads right now, someone might be lead to think that the more boil water advisories, the better job you're doing. But would you want to define your success by the number of times you communicate your failure in providing safe drinking water? Probably not. It's better to have no boil water advisories at all because you've put enough checks and balances in place to ensure safe and clean drinking water 100% of the time.
So, your performance story would be better if it read:
Expected Result: Clean and safe drinking water for the residents of the Little Buffalo Reserve.
Performance Indicator: Number of boil water advisories.
Target: Zero boil water advisories for 2010.
That's a performance story that makes sense.
Read more about developing Key Performance Indicators.
Showing posts with label key performance indicators. Show all posts
Showing posts with label key performance indicators. Show all posts
Wednesday, April 7, 2010
Monday, March 29, 2010
Break out the spandex and big hair - it's time to define your key performance indicators
It's hard to believe that the big hair behind such classics as Jump and Panama could be the basis for a lesson in performance measurement. But Van Halen, and David Lee Roth, are just that.
You've probably heard the story about Van Halen insisting that there be no brown M&Ms backstage. But what you may not have known is that it wasn't (just) the band acting like rock & roll divas; it was actually an ingenious performance indicator.
David Lee Roth explained the clause in the band's rider in his auto-biography:
Van Halen was the first band to take huge productions into tertiary, third-level markets.
We’d pull up with nine eighteen-wheeler trucks, full of gear, where the standard was three trucks, max. And there were many, many technical errors — whether it was the girders couldn’t support the weight, or the flooring would sink in, or the doors weren’t big enough to move the gear through. [...] So, when I would walk backstage, if I saw a brown M&M in that bowl . . . well, line-check the entire production.
Guaranteed you’re going to arrive at a technical error. They didn’t read the contract. Guaranteed you’d run into a problem.
Sometimes it would threaten to just destroy the whole show. Something like, literally, life-threatening.
So next time you're trying to explain to a group of managers that you don't need to know the number of emails they sent last week, you only want performance data that gives an indication of the state of affairs -- try tossing on Hot For Teacher, and challenging them to find the brown M&Ms in their own programs.
Read more about Van Halen and the brown M&Ms. Check out Dan & Chip Heath's book: Made To Stick!
http://www.fastcompany.com/magazine/143/made-to-stick-the-telltale-brown-mampm.html
Subscribe to:
Posts (Atom)